Woodridge Park District Athletic Recreation Center

LOCATION

Woodridge, IL

COMPLETED

2017

CLIENTS INVOLVED

Williams Architects & Woodridge Park District

INDUSTRY

Government

SOLUTIONS PROVIDED

Mechanical Engineering
Electrical Engineering
Plumbing Engineering
Fire Protection Engineering

Project Description

WT Group’s MEP Team provided HVAC, Plumbing, Electrical and Sprinkler Engineering services for the new ±75,000 square foot Athletic Recreation Center. Services Included: Schematic Design Design Development Construction Document Bidding and Negotiations Construction Administration Project Closeout Design Features: Walking/Jogging Track Cardio/Weight fitness area and aerobic room Gymnasium Ropes Course Indoor artificial turf field Multi-Purpose room, community resource center room, and child watch room Warming kitchen/concessions room Locker rooms Mechanical System Incorporates: Multiple VAV rooftop units and VAV boxes with hot water reheat serve each zone High efficiency boilers provide hot water to VAV reheat coils A direct digital control system provides control and monitoring the entire HVAC system Plumbing System Incorporates: Sustainable design practices include the use of low-flow fixtures, grease waste system, Interior storm system for roof drainage, sanitary and waste system and a domestic water distribution system. Electrical System Incorporates: 1200-AMP, 277/480V, 3 phase electrical service with surge project Exterior LED lighting and interior LED lighting with daylight harvesting Multi-level gymnasium and turf field lighting Voice evacuation fire alarm system

More Projects

DuPage Medical Group

DuPage Medical Group

View more
AMLI Lofts

AMLI Lofts

View more
Addison Public Library Interior Renovation

Addison Public Library Interior Renovation

View more